How much of my process time is actually worth paying for?

Tag observed process steps against the eight wastes and compute the value-add ratio.

Waste Walk · lean · White Belt · free, no account needed

Use this when

  • You have observed a process end to end and timed each step
  • Someone has proposed hiring more people to go faster
  • You need to show where the time really goes

Waste Walk

sandbox

Classify every step. Apply the customer test each time — would they pay for this? Effort and skill are never the test.

Observed process steps, their durations, and their classification.
StepMinClassificationWaste category
Arrive and join queue12
Give name at desk1
Wait for record retrieval8
Confirm details3
Wait for triage nurse17
Triage assessment6
Wait for room21
Consultation14

Lead time

82 min

Value-add

0 min

Value-add ratio

0%

Waste

82 min

8 non-value-add steps have no waste category. Categorising them is what turns "this is waste" into a specific thing you can change.

How this is calculated

Value-add ratio = value-add time ÷ total lead time. The denominator is the whole clock, including every wait — not the time the team was busy. That distinction is what separates “how busy were we?” from “how much of the customer’s wait was worth it?”

  • Value-addThe customer would pay for it, it changes the thing, and it is right first time.
  • Business-necessaryThe customer would not pay for it, but you cannot stop doing it.
  • WasteEverything else.

Source: Rother & Shook (1999), Learning to See; the eight wastes from Ohno (1988), Toyota Production System, Ch.3.

  • Transport — moving the product
  • Inventory — work sitting and waiting
  • Motion — moving the person
  • Waiting — work exists, nothing is happening to it
  • Over-production — more, or sooner, than the next step needs
  • Over-processing — beyond the customer requirement
  • Defects — rework, correction or scrap
  • Unused talent — the people doing the job were never asked

How this is calculated

Value-add ratio = sum(value-add time) / sum(total lead time). No inference; arithmetic on observed durations.

Source: Ohno, T. (1988), Toyota Production System, Ch. 3 — the seven wastes; the eighth (unused talent) is a later addition and is labelled as such in the tool.